Failure to mention asbestos
When selling or leasing property it is absolutely vital to answer pre-contract inquiries accurately and the consequences of not doing so can be severe.
In the case of First Tower Trustees Limited & Anr v CDS (Superstores International) Limited (2017), a tenant of warehouse premises was awarded a seven-figure compensation after asbestos was discovered shortly after the lease was signed.
In reply to the tenant’s inquiries prior to execution of the lease, the landlords stated that they were unaware of any environmental problems relating to the premises. The landlords had in fact received an email from a specialist firm which reported a health and safety risk arising from the presence of asbestos.
Soon after the lease was signed, the tenant discovered the asbestos problem and very substantial remedial works were required before it could take up occupation.
The High Court acknowledged that landlords do not generally warrant the state or condition of premises before they are let and that it is for tenants to make their own inquiries, by survey or otherwise.
However, the statement that the landlords knew nothing of any environmental issues, when they had in their possession information that clearly pointed to a serious problem, amounted to a misrepresentation.
A term of the lease stated that the tenant acknowledged that the lease had not been entered into in reliance on any statement or representation made by the landlords.
However, the Court found that that provision was highly unreasonable and did not enable the landlords to escape liability. The tenant was awarded the costs of the remedial works and of arranging alternative warehouse accommodation during the period that it took to complete them.
[edit] Related articles on Designing Buildings Wiki
- Asbestos.
- Asbestos cement.
- Asbestos management.
- Asbestos register.
- Control of Asbestos Regulations 2012 CAR12.
- Failure to notify tenant.
- Five signs you are at risk of asbestos poisoning at work.
- Material non-disclosure.
- Misrepresentation and insurance.
- Pre-construction information.
- Property disrepair and landlord liabilities.
- The risk of asbestos on brownfield sites.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.